TPM250E 450KG Electric Tracked Barrow FAQ

The below FAQ is designed to help assist with any questions that we have been asked over the years, to get you up and running as swiftly as possible.

mule-transporter

Always ensure that the motor is switched off on your tracked barrow before you follow any of the advice listed below.

 

Assembly

We have produced a video showing how to configure and assemble the bed on this barrow - this can be seen by clicking here: Electric Tracked Dumper Bed Build

 

Operation

The following video shows how to start and stop the drive functionality on the Mule tracked barrow. This video applies to models from 2023 and later: Operating Procedure

 

Maintenance

The following video shows how to adjust the track tension on the Mule tracked barrow. You will require a 24mm spanner to complete this job: Adjusting the Track Tension

The following document outlines how to replace the speed sensor on this model. You will require a 10mm spanner, a 7mm spanner and a small Phillips screwdriver to complete this job: Replacing the Speed Sensor

Secure online payments with

Your Payment Options